Spec1
Well-Known Member
- Joined
- Apr 11, 2022
- Threads
- 0
- Messages
- 64
- Reaction score
- 104
- Location
- los Angeles
- First Name
- Clinton
- Vehicle(s)
- Mach 1 Hp
I did hear the same problem regarding the cup2 tires. Tires are difficult to make in cold weather.I'm not aware the order banks are closed, but the window for production is closing. Mustang MY23 order banks open in October. If ordering a Mach 1 HP, the build has to complete before it gets too cold, due to the tires. Can't confirm how late you can order, but it seems September would be the latest date to build. Shipping from factory to dealer is approximately 30 days, if not more.
Sponsored