Asharus
Well-Known Member
- Joined
- Aug 11, 2014
- Threads
- 24
- Messages
- 3,508
- Reaction score
- 643
- Location
- Boca Raton, FL
- First Name
- Angelo
- Vehicle(s)
- 2018 Challenger Scat Pack
and lack of PP option for verts
Sponsored
In Arkansas...if we get any snow or ice, it is usually around February. However, with this cold front moving in now we might have a white christmasA and winter approaching...lol except those in CA or FL... even then cali is still cold...that time of year..at least for me it is
Believe I have thought about this because I live on Long Island too and I am beyond anxious but I would rather have it in summer and not bash it with snow and road salt as soon as I get it. Waited this long, another 2 months will seem like an eternity but it is what it is at this point.i would just order like i did and just brave the winter, lol
This year we had frost all the way into april with the so called"polar vortex"In Arkansas...if we get any snow or ice, it is usually around February. However, with this cold front moving in now we might have a white christmas
I was given a currentbuildweek last week. That was showing 10/28/14 last week. However, now, there is no currentbuildweek for my order. Check out VIN: 1FA6P8CF6F5322633You only were given a "current build week". This is still showing in your code:
"currentBuildWeek": "2014-10-26 19:00:00"
Your Window Sticker link won't work until that date gets closer. Then you can search in the code for "currentbuilddate" and you will have an estimated build day.
This will be the same date that will show on your Window Sticker (AKA, Blend Date).
you must use your dealer code and order numberI was given a currentbuildweek last week. That was showing 10/28/14 last week. However, now, there is no currentbuildweek for my order. Check out VIN: 1FA6P8CF6F5322633
Am I missing something?
Using your Order # and Dealer Code (which I was able to find using your VIN), this is what source code says:I was given a currentbuildweek last week. That was showing 10/28/14 last week. However, now, there is no currentbuildweek for my order. Check out VIN: 1FA6P8CF6F5322633
Am I missing something?
I wonder if sometimes the VIN is independent of finding a slot for the build date.you must use your dealer code and order number
your vin works with population fields closer to the build week. Hence why your car, when ordered, was not given a VIN then...just a dealer code, order number.I wonder if sometimes the VIN is independent of finding a slot for the build date.
From "Racheal corporate eavesdropper" (rumor has it that she had to file a restraining order on 'the most interesting man in the world', i.e., that is hot) I got the following "the VIN is xxxxxxxxxxxx. Your Mustang is currently "In Order Processing" and it looks like it will be toward late October to schedule to build (subject to change). "