Jimmy Dean
Well-Known Member
- Joined
- Jul 26, 2019
- Threads
- 31
- Messages
- 2,038
- Reaction score
- 2,418
- Location
- Baton Rouge
- First Name
- Al
- Vehicle(s)
- 71 mach 1, 82 Bronco, 86 Bronco (dd),
Got my VIN today after ordering couple days ago and after damage to the original one I ordered in March came last week. Priority 1. Joke. My scheduled build date is Sept 27th. 2 months. If they still sold the challenger 50th anniversary I would get that and cancel this crap
I think that the 27SEP build date many of us have, who have been on order for months, and yours Scotty which has been on order for days, and yours Mike, point to it being a singular part that is massively backordered and they aren't getting more in until that week. My guess would be the tires, since we cannot seem to locate them anywhere right now. basically, I would not expect to see a single HP Mach 1 roll off the line between now and the beginning of October (the last part of the week of 27SEP)Yeah at this point it's pretty obvious that the whole order priority code thing is a fraud. I've been a priority 1 for two months but scheduled for September like everybody else.
So no, your Prio 1 job has been placed with the first available build date with all pieces and parts available. and my guess is that maybe they have 100 HP Machs scheduled that week, is that if their order gets updated from Michellin that they're not getting 100 sets of tires, but only 50, that yours Scotty will be one of the 50 that get built that week, while me any 49 others who are fairly recent orders (15JUN here) that are not high priority (prio 19 here), get bumped until Michellin says that they can provide another 50 sets of tires, and then some of us will get bumped further when other new prio 1 jobs get ordered and slotted in ahead of us.
So no, your order is being built as soon as possible, and you have pushed me and others further back (don't blame you, that situation sucks, sorry you had to reorder....)
Sponsored