Brent Davis
Well-Known Member
- Joined
- Dec 24, 2015
- Threads
- 27
- Messages
- 449
- Reaction score
- 192
- Location
- Northern Virginia
- Vehicle(s)
- 2018 Shadow Black Premium Mustang GT
Yes that is a reasonable amount of time. Once the drivers headed is on, bolt both turbos on, take nose off and install intercooler, install hoses and clamps, plumb the water cooler lines, modify the trans cooler lines, install wastegates, install filters, install downpipes and connecting pipes which would be about 6-8 hours. Now the other supporting items like installing the fuel system, injectors and plugs is separate time. I’m talking just the kit.6-8 Hours for LPF?? That's less than a blower kit... Man my Hellion Kit took 20+ hours, granted by myself in my garage on jacks LOL.
Sponsored