Sponsored

Week 5 - Still in In Order Processing

barok

Member
Joined
Apr 21, 2015
Threads
4
Messages
24
Reaction score
1
Location
Canada
Vehicle(s)
2015 Mustang Ecoboost
Signed paper works March 28. They provided VIN # after two weeks ago.

Checked Cotusb site, now on week #5 and it's still "In Order Processing". I called my dealership and they don't have ETA on my order.

Is there a better to track our orders? I don't want to burn my winter tires now that the weather is up to two digits.
Sponsored

 

comagt

Well-Known Member
Joined
Mar 27, 2015
Threads
6
Messages
218
Reaction score
43
Location
San Antonio TX
Vehicle(s)
2015 Mustang GT
Signed paper works March 28. They provided VIN # after two weeks ago.

Checked Cotusb site, now on week #5 and it's still "In Order Processing". I called my dealership and they don't have ETA on my order.

Is there a better to track our orders? I don't want to burn my winter tires now that the weather is up to two digits.
If they have a VIN then ask the dealer for the build week, this is assigned when a VIN is created. That will roughly tell you when www.cotus.ford.com will switch to in production. As it will flip to in production seven days prior to the final build date.
 

lltrigg3rzonell

Well-Known Member
Joined
Jan 14, 2015
Threads
3
Messages
72
Reaction score
18
Location
Toronto Canada
First Name
Stephen
Vehicle(s)
2015 Mustang GT Premium | Race Red
Build week is usually 4 weeks after the VIN has been pulled.

Then the delivery date is week 5-6
 
OP
OP

barok

Member
Joined
Apr 21, 2015
Threads
4
Messages
24
Reaction score
1
Location
Canada
Vehicle(s)
2015 Mustang Ecoboost
That was my assumption but cotus website shows "in order processing". I understand the status if the order is on week 3-4, however no updates since then.

I might have a call my sales guy again.
 

r-model

Well-Known Member
Joined
Oct 1, 2014
Threads
21
Messages
303
Reaction score
35
Location
Toronto, Ontario, Canada
Vehicle(s)
Current: 1987 GT, not stock :-) DD - 2001 F150
On cotus, see if you can access the window sticker, it should be able to tell you when the car is scheduled to be built. That's the number at the top of the window sticker just to left of the center. Refered to as the blend date
 

Sponsored

OP
OP

barok

Member
Joined
Apr 21, 2015
Threads
4
Messages
24
Reaction score
1
Location
Canada
Vehicle(s)
2015 Mustang Ecoboost
No window sticker yet :(
 

opensesame

Well-Known Member
Joined
Jul 8, 2014
Threads
122
Messages
1,895
Reaction score
346
Location
Toronto
Website
www.youtube.com
Vehicle(s)
2015 Mustang Oxford Ecobeast with PP

RevvdMedia

Well-Known Member
Joined
Aug 29, 2013
Threads
60
Messages
718
Reaction score
160
Location
Canada
Vehicle(s)
2015 Mustang GT Premium
The tracking system for Canada seems to be delayed compared to the US. Don't feel too bad though, I had ordered mine December 23, and didn't even have a VIN until mid February.
 
OP
OP

barok

Member
Joined
Apr 21, 2015
Threads
4
Messages
24
Reaction score
1
Location
Canada
Vehicle(s)
2015 Mustang Ecoboost
To makes things worse, I sold my summer tires on my DD. I'm stuck with my winters and I have an upcoming drive to Kingston for my Regional Basketball Tournament.
 

Guardstang

Well-Known Member
Joined
Nov 16, 2014
Threads
9
Messages
218
Reaction score
57
Location
Hamilton, Ont
First Name
Shawn
Vehicle(s)
2015 Ecoboost
I ordered my car Jan 20th and it arrived 2nd week of March--once it goes into production the process is fast--and being a 6 hour drive from Flatrock the car showed up quick.
Sponsored

 
 








Top