My hooker long tube headers have arrived and I called a local shop for a quote. They stated 11 hours for the install which seems excessive. What kind of hours are typical for this type of install?
I am comfortable doing some mods but LTH seems a little outside my comfort zone. If I had a lift maybe but on jack stands that seems rough. I will check around but seems like everyone agrees that 11 hours is way too much for this.
I did mine on jack stands by myself. Took me about 4 days but I was on vacation at the time, so I took my time. The only specialty tool you need is an inverted torx socket to remove the factory studs if needed. The rest of the job can be done with a good selection of metric sockets and wrenches.