pwnednooblol
Member
- Joined
- Mar 4, 2022
- Threads
- 2
- Messages
- 24
- Reaction score
- 5
- Location
- Houston, Texas
- Vehicle(s)
- 2022 Ford Mustang GT
- Thread starter
- #1
I placed an order on 2/14/2022 for a 2022 GT Fastback with 301a, automatic transmission, and active exhaust. I received an email from Ford on 2/18/2022 that my order was received and confirmed with those packages.
However, I've been thinking about adding the Ford Safe and Smart package onto my order, and I finally added it yesterday (3/9/2022) onto my existing order. My order does not have a scheduled build date yet.
Do you all think since I added this package, I have been moved to the bottom of the queue, and this will cause a delay on my build date? Or will I remain in the same spot on the queue and soon receive a build date sometime this month?
However, I've been thinking about adding the Ford Safe and Smart package onto my order, and I finally added it yesterday (3/9/2022) onto my existing order. My order does not have a scheduled build date yet.
Do you all think since I added this package, I have been moved to the bottom of the queue, and this will cause a delay on my build date? Or will I remain in the same spot on the queue and soon receive a build date sometime this month?
Sponsored