NGOT8R
Well-Known Member
- Thread starter
- #16
I’ve finally gotten around to starting on this mod and I’ve already encountered several challenges, such as:
- Modifying the driver’s seat trim to clear the 1st stage control valve assembly.
- Building a custom wiring harness (this will probably be my most favorite part of the install).
- Choosing mounting locations for the components.
- Drilling two holes in the firewall to install bulkhead fittings for the hydraulic lines that need to get from the engine bay to the cabin.
- Measuring for the 6 custom hydraulic lines that are needed for the setup. Note: I used an old extension cord for this (just routed it like I will each hydraulic line, taped it off and measured to determine the lengths needed). The lines and some additional fittings that have been ordered and I hope to have them in hand by the end of next week.
Here are some pics of the mock-up.
- Modifying the driver’s seat trim to clear the 1st stage control valve assembly.
- Building a custom wiring harness (this will probably be my most favorite part of the install).
- Choosing mounting locations for the components.
- Drilling two holes in the firewall to install bulkhead fittings for the hydraulic lines that need to get from the engine bay to the cabin.
- Measuring for the 6 custom hydraulic lines that are needed for the setup. Note: I used an old extension cord for this (just routed it like I will each hydraulic line, taped it off and measured to determine the lengths needed). The lines and some additional fittings that have been ordered and I hope to have them in hand by the end of next week.
Here are some pics of the mock-up.
Sponsored