snakeyes
Well-Known Member
Correct me if I'm wrong: but Ford won't build or ship vehicles that are equipped with Cup2 tires in the Winter
Sponsored
That is correct.Correct me if I'm wrong: but Ford won't build or ship vehicles that are equipped with Cup2 tires in the Winter
Wow...Tell you what I'm so impressed with my Mach 1 A10 - I'm thinking of selling my GT500 and buying a 6 speed Mach and banking the rest of the cash ... No really ...
I get it- have a 20 500- the 6 speed is so more involving.Tell you what I'm so impressed with my Mach 1 A10 - I'm thinking of selling my GT500 and buying a 6 speed Mach and banking the rest of the cash ... No really ...
German configurator is online and they have pretty good renderings (trustful at least, like we had with accurate Velocity Blue in 2021, unlike US B&P).Have you seen the M1 in Eruption Green?
The pictures above are the best I've seen. I would assume the configurator would be up shortly, but they are always behing actual orders.So, Zach, a few questions:
1- When will Ford put out the 2022 Mustang Build and Price?
2- Have you seen the M1 in Eruption Green? I am very interested in the green and wonder what tape stripe configuration Ford has in store for it.
Love to see a picture!
Yay!We are still getting 2021 Mach 1s arriving on a weekly basis. Here are 3 that showed up overnight.
We have about 10 left that are in the process of production and the last production date we have for a Mustang on the 21s is 12/18.
Excitingly, this is our first week of 2022 Mustang scheduling as well! We had VINs assigned on 13 total Mustangs. The scheduling weeks of production for those units are 1-10 through the end of January.
Is that FJG one mine??We are still getting 2021 Mach 1s arriving on a weekly basis. Here are 3 that showed up overnight.
We have about 10 left that are in the process of production and the last production date we have for a Mustang on the 21s is 12/18.
Excitingly, this is our first week of 2022 Mustang scheduling as well! We had VINs assigned on 13 total Mustangs. The scheduling weeks of production for those units are 1-10 through the end of January.
You ordered a 2021 in September and it’s getting built now? And it’s a premium?Yay!
Thanks. It is 700a non-HP. I believe there are several of us, non-HP, who ordered from Granger around that same time and are now being built, what @Zach@Granger said about the last 10 being produced. Looks like the last batch of 2021You ordered a 2021 in September and it’s getting built now? And it’s a premium?
is it a Handling Package?
BTW: congratulations you must be crazy happy