domingos35
Well-Known Member
- Joined
- Jul 6, 2014
- Threads
- 39
- Messages
- 185
- Reaction score
- 15
- Location
- South Florida
- First Name
- Joe
- Vehicle(s)
- Currently drive 2005 F-150 STX
- Thread starter
- #1
If I want the car delivered by mid March?
Sponsored
Order now. I ordered in late oct and it won't be here till jan 20th. Ordering now will also get you in line after the factory come off Xmas break.If I want the car delivered by mid March?
Order now. I ordered in late oct and it won't be here till jan 20th. Ordering now will also get you in line after the factory come off Xmas break.
If everything went perfect in your build and delivery you could, in theory, get it by the end of January. But that's a long shot. Being in central(?) Florida doesn't help though.That sucks :(
Might as well have waited for the 2016 models![]()
I ordered on 11/30 and just got an EDD of 01/29 on COTUS. I am guessing the build date will be week of 5th/12th?If you ordered today AND your order gets pulled this week, your car would be built the week of January 19th. and then about 3 weeks for delivery so it would come in around the middle of February.
No orders are being pulled for the next two weeks so an ordered that's pulled the first week of January should be built the week of January 26th with a delivery towards the end of February.
That should give you an idea of when you want your order pulled. However, with all the variables involve, I STRONGLY recommend ordering it right now, unless you wouldn't have any problem with an April delivery if everything doesn't go EXACTLY as planned.
Hopefully haha, I was really hoping by the end of Jan, but two or so weeks into Feb would be okay as well. I cant really complain though considering some people have been waiting a lot longer than me and still don't have a car....:hail::hail::hail::hail:If everything went perfect in your build and delivery you could, in theory, get it by the end of January. But that's a long shot. Being in central(?) Florida doesn't help though.
Stang Nut. I hope your dates are accurate as my VIN date was 12/4 but IIf you ordered on the 30th, the order should have been pulled the night of 12/4 and your build week would be 1/12. The EDD is usually 2 weeks after the car is built, but that EDD is a generic estimate.
Not at all. There are a lot of VIN's that are assigned but not scheduled. I've been tracking one car that got a VIN assigned on October 30 but hasn't been scheduled for build yet.If you ordered on the 30th, the order should have been pulled the night of 12/4 and your build week would be 1/12. The EDD is usually 2 weeks after the car is built, but that EDD is a generic estimate.
As of this morning the car is listed as "In Production" on COTUS and there is a window sticker link (which I cannot see since the website is not loading).If you ordered on the 30th, the order should have been pulled the night of 12/4 and your build week would be 1/12. The EDD is usually 2 weeks after the car is built, but that EDD is a generic estimate.