2018/2019 production schedule

Silver Bullitt

Well-Known Member
Joined
Feb 26, 2018
Threads
18
Messages
2,391
Reaction score
2,295
Location
Parkville, MO
Vehicle(s)
2018 GT Coupe PP2
I don't claim to know much about all this, but based on the following post on BO, if you ordered an '18 GT with Performance Pack and manual transmission, and you haven't received a scheduling confirmation yet, I'm thinking you better start looking for one on a dealer lot somewhere or prepare to order a '19. I asked if this was also for GT's with PP2, but haven't gotten a response yet.

http://www.blueovalforums.com/forum...018-mustang-production-information/?p=1025491
Sponsored

 

ATTFighter

Well-Known Member
Joined
Nov 4, 2014
Threads
39
Messages
494
Reaction score
38
Location
Florida
Vehicle(s)
2018 Mustang GT
Well, I got an email today from COTUS that my car is now "IN ORDER PROCESSING" and it now has a VIN and shows up in COTUS tracker with a ordered date of 3/19/18. This is for a 2018 Mustang GT with black accent package/ 301a. So I think at this point it is safe to say mine will be built? I cant believe its already showing up in COTUS 3 days after the order being placed. I heard of people saying it took weeks for theirs to show up in COTUS.
 

sebounet

Well-Known Member
Joined
Jan 17, 2017
Threads
40
Messages
496
Reaction score
300
Location
montreal
Vehicle(s)
2018 conv gt auto, var exhaust,shaker, safety pack
I had my vin very fast also, few days, like 4. Ordered 26/02, devilevery around mid april
2018 gt premium convertible orange fury, interior ceramic, active exhaust, shaker pro, safety package
 

ATTFighter

Well-Known Member
Joined
Nov 4, 2014
Threads
39
Messages
494
Reaction score
38
Location
Florida
Vehicle(s)
2018 Mustang GT
I had my vin very fast also, few days, like 4. Ordered 26/02, devilevery around mid april
2018 gt premium convertible orange fury, interior ceramic, active exhaust, shaker pro, safety package
nice grats, i hope I get my car in April too, wishful thinking probably haha.
 

Silver Bullitt

Well-Known Member
Joined
Feb 26, 2018
Threads
18
Messages
2,391
Reaction score
2,295
Location
Parkville, MO
Vehicle(s)
2018 GT Coupe PP2
Well, I got an email today from COTUS that my car is now "IN ORDER PROCESSING" and it now has a VIN and shows up in COTUS tracker with a ordered date of 3/19/18. This is for a 2018 Mustang GT with black accent package/ 301a. So I think at this point it is safe to say mine will be built? I cant believe its already showing up in COTUS 3 days after the order being placed. I heard of people saying it took weeks for theirs to show up in COTUS.
Wow! Congrats! That sure was fast.
 

Sponsored

Silver Bullitt

Well-Known Member
Joined
Feb 26, 2018
Threads
18
Messages
2,391
Reaction score
2,295
Location
Parkville, MO
Vehicle(s)
2018 GT Coupe PP2
Well that confirms it, 2018 banks are still open. Congrats man!
2018 order banks close today (3/22). Final scheduling will be complete in two weeks (4/5). GT w/ PP1 and manual transmission are balanced out and no more will be scheduled at this point. GT w/ PP2 is still possible. We will know for sure by 4/5 if any outstanding orders are going to get scheduled/built or not. This is from what I believe to be a pretty good source.
 

ATTFighter

Well-Known Member
Joined
Nov 4, 2014
Threads
39
Messages
494
Reaction score
38
Location
Florida
Vehicle(s)
2018 Mustang GT
2018 order banks close today (3/22). Final scheduling will be complete in two weeks (4/5). GT w/ PP1 and manual transmission are balanced out and no more will be scheduled at this point. GT w/ PP2 is still possible. We will know for sure by 4/5 if any outstanding orders are going to get scheduled/built or not. This is from what I believe to be a pretty good source.
wow, so i literally just made it lol. So does that mean I will have a build date by 4/5 ?
 
 