Sponsored

Mustang Assembly Time

RMS70

Member
Joined
Feb 12, 2016
Threads
2
Messages
7
Reaction score
0
Location
Chester, VA
Vehicle(s)
2014 Mustang GT
How long does it take to assemble the body pieces into the shell ready to be painted? I read that it takes 10 hours to paint the shell and 6.5 hours on the trim line, but can't find anything about assembling the shell.
Sponsored

 

SINBUSTER007

Well-Known Member
Joined
Oct 5, 2014
Threads
18
Messages
727
Reaction score
620
Location
Hagerstown, MD
First Name
Brian
Vehicle(s)
19 Edge ST, 17 Escape, 12 Boss, 15 GT, 66 V8 Coupe Auto, Kids Boss 302
one of the old production line videos they mention that from start to finish it takes about 8-10hrs to fully assemble a car.
a car is completed around every 90 seconds according to the video. given all the parts are there and ready to be assembled.
delays factor into the time also...
 

NoVaGT

Banned
Banned
Banned
Joined
Sep 29, 2016
Threads
115
Messages
5,621
Reaction score
4,377
Location
Northern Virginia
Vehicle(s)
2019 PP1 GT Kona
How long does it take to assemble the body pieces into the shell ready to be painted?
4 hours, 35 minutes, and 14 seconds. But if Irene is working, it takes 30 seconds longer. She's old.
 

IPOGT

Well-Known Member
Joined
Feb 11, 2016
Threads
73
Messages
4,756
Reaction score
5,881
Location
Southern Long Island Section Of Florida
First Name
Alan
Vehicle(s)
2021 Mustang Mach 1 Velocity Blue M4336
They save an extra few minutes by not caring if the back window is lopsided.
 

NoVaGT

Banned
Banned
Banned
Joined
Sep 29, 2016
Threads
115
Messages
5,621
Reaction score
4,377
Location
Northern Virginia
Vehicle(s)
2019 PP1 GT Kona
 








Top