RubyRed15
Ok, so it's blue.
- Thread starter
- #1
I was initially planning to write this all out in the forum, but it turned into a 25pp document, so I've attached it as a PDF. I've included the other reference PDFs I used to complete my installation, too, including the v3 diagram from Aquamist, which I did not use, but you will need if your car has the 16 pin width ECU plugs.
I chose the Aquamist system for my Ecoboost Mustang, despite its considerably-higher expense over the competition, because it seems to be the most comprehensively well-engineered system with the best built-in failsafe. The major competitors’ inadequate or non-existent failsafes rendered them non-options for me. There are several gaps in the Aquamist installation instructions, so I am attempting to capture as much of my learning as possible for anyone coming behind me with a Mustang installation.
This is a fairly advanced installation. You’ll need to know how to read wiring diagrams and schematics in addition to general mechanical competencies like making holes, measuring, wiring, and so on. You assume and are responsible for any and all risks and any and all damage that occurs from your installation.
Install Time: plan for four full days.
Table of Contents
I chose the Aquamist system for my Ecoboost Mustang, despite its considerably-higher expense over the competition, because it seems to be the most comprehensively well-engineered system with the best built-in failsafe. The major competitors’ inadequate or non-existent failsafes rendered them non-options for me. There are several gaps in the Aquamist installation instructions, so I am attempting to capture as much of my learning as possible for anyone coming behind me with a Mustang installation.
This is a fairly advanced installation. You’ll need to know how to read wiring diagrams and schematics in addition to general mechanical competencies like making holes, measuring, wiring, and so on. You assume and are responsible for any and all risks and any and all damage that occurs from your installation.
Install Time: plan for four full days.
Table of Contents
- Tools, Materials, and Parts Needed (other than standard tools, wrenches etc.)
- Plan Your Installation.
- Tank Installation.
- Methanol Vent Installation.
- Pump Installation.
- 6mm Line Plumbing.
- Pump Harness Routing.
- FAV Installation.
- ECU Harness Installation.
- Left-side Harnesses.
- Controller Installation.
- Silicone Hose Adapter/Nozzle Installation.
- Notes on Initial Testing.
- Setting the Failsafe.
Sponsored
Attachments
-
122.6 KB Views: 276
-
333 KB Views: 483
-
365.4 KB Views: 385
-
1.8 MB Views: 305
-
333.7 KB Views: 271
-
345 KB Views: 304
-
7 MB Views: 979