gbgreen
Well-Known Member
- Joined
- Mar 10, 2018
- Threads
- 3
- Messages
- 146
- Reaction score
- 63
- Location
- Central NJ
- First Name
- Gerry
- Vehicle(s)
- 2016 Ruby Red Manual V6 Mustang Coupe
The attached screen shot from The Blue Oval Forums seems to back up some of what Bullitt said. It's from the "Production Week Scheduling Timetable" forum.I believe some people are back to work on Monday the 9th, but the actual production line I think doesn't open back up until the 16th according to the Blue Oval Forums. I think for cars that have already been produced there's a chance to see some movement next week, but could very well be radio silence until at least the 16th. Sounds like it could be a long month lol.
It shows Mustang down weeks (2019 Model Year) as "07/02, 07/09".
Wikipedia (so, grain of salt...) says that Flat Rock currently produces the Mustang Coupe and the Lincoln Continental.
The attached Scheduling Timetable lists the down week for the Continental (2018 Model Year) as "07/02". One would infer from this that production of the 2018(!) Continental to resume on July 9th (backing up the "some activity" comment), buuuut, activity for the Mustang would not resume until the 16th.
Seems odd to have two different model year vehicles built on the same production line.
Anyway, FWIW...
Sponsored
Attachments
-
71.2 KB Views: 281
Last edited: