KeiRodez
Well-Known Member
- Joined
- Jan 15, 2015
- Threads
- 15
- Messages
- 116
- Reaction score
- 13
- Location
- York, Pennsylvania
- Vehicle(s)
- 2015 Ecoboost Convertible w/PP
3/16 Blend Date here.
I wonder how long the car is on the production line, from start to finish?
1 day, 2 days, 3 days? Anyone know for certain how long it takes?
I believe on average it takes about 1 day. It will show in Cotus as "In Production" 4-5 days before it is actually built. If you can access your window sticker, it should have a blend date on the top which is considered the build date. My blend date appears on the sticker as 120150317 - Basically you delete the 1 at the front and break it down between the year, month and day. So mine is actually 03/17/2015. Hope that helps!Mine is in production for 3 days already.
Sponsored

