Sponsored

LE Production

SVTFreak

#275
Joined
Jan 6, 2014
Threads
60
Messages
3,478
Reaction score
733
Location
Prairieville, LA
Vehicle(s)
2015 Wimbledon white LE #275 A6
Oh sorry MC. I thought those two numbers needed to be added. Thanks man!

Three cheers for Mc!

Dealer confirmation. Built and soft delivery date is 15-20. Yes he said those could change a lot until on the rail car.
Sponsored

 

wilkinda65

Well-Known Member
Joined
Jan 31, 2014
Threads
23
Messages
1,733
Reaction score
711
Location
Sun City Center, FL
First Name
David
Vehicle(s)
2020 Charger ScatPackWB
Can we get a list of VIN#s that are already built?
 

Sponsored

SVTFreak

#275
Joined
Jan 6, 2014
Threads
60
Messages
3,478
Reaction score
733
Location
Prairieville, LA
Vehicle(s)
2015 Wimbledon white LE #275 A6
Just got notice of Delivery date 10/16 OMG

Easy, yours was built 9/29? If so, be patient. The initial eta's are very variable until it's actually loaded up and on the way. My eta is 10/15 to the 21st. Figures I'll be in DC the 17to the 20th lol
 

Brent302

Well-Known Member
Joined
May 13, 2014
Threads
18
Messages
3,528
Reaction score
399
Location
Springfield VA
Vehicle(s)
2015 Mustang GT/PP

Sponsored

SVTFreak

#275
Joined
Jan 6, 2014
Threads
60
Messages
3,478
Reaction score
733
Location
Prairieville, LA
Vehicle(s)
2015 Wimbledon white LE #275 A6
I gotta admit that I've been preaching patience for months. 10 of them to be exact. But now that I know it is built, and maybe will arrive in 2-3 weeks, I'm starting to get very anxious. Maybe even a little obsessive. I keep checking 5-6 times a day looking for it to switch to in transit.

Just sayin
 
OP
OP

1377IP

Member
Joined
Aug 6, 2014
Threads
1
Messages
22
Reaction score
0
Location
arizona
Vehicle(s)
2015 LE (wimbeldon white)
anybody have any idea about when vin '465 should be built?
Sponsored

 
 








Top