ronemca
Well-Known Member
- Thread starter
- #1
* 170927 edit *
I have made an arrangement with a fellow M6g member to buy something from him when he removes it early next year. I'm saying this because I want to illustrate that I would much rather "seal a deal" well in advance than lurk and wait and wonder and try to get on here every seven minutes of every day to pounce upon the next cold side [bunged] pipe that pops up FS.
Yeah - the whole 'strike-while-the-iron's-hot' thing can be exciting, but...well...I've said it all above.
I want a BLACK, name brand, 1/8" bunged COLD SIDE CHARGE PIPE.
Crinkle black is my 1st choice, dark grey (think AEM or AFe) is my 2nd choice. (I would consider silicone, but only as a last resort)
Must have at least one 1/8" NPT threaded bung.
I don't want your OE clamps, but if you have a set of a/m t-bolts available I am keen to talk about those.
I don't mind if it has a little scratch in a visible area, but not dented please.
If you know you're going to part one out in six to 10 weeks, please give me a chance to negotiate something with you.
CONUS shipping will be requested.
I have made an arrangement with a fellow M6g member to buy something from him when he removes it early next year. I'm saying this because I want to illustrate that I would much rather "seal a deal" well in advance than lurk and wait and wonder and try to get on here every seven minutes of every day to pounce upon the next cold side [bunged] pipe that pops up FS.
Yeah - the whole 'strike-while-the-iron's-hot' thing can be exciting, but...well...I've said it all above.
I want a BLACK, name brand, 1/8" bunged COLD SIDE CHARGE PIPE.
Crinkle black is my 1st choice, dark grey (think AEM or AFe) is my 2nd choice. (I would consider silicone, but only as a last resort)
Must have at least one 1/8" NPT threaded bung.
I don't want your OE clamps, but if you have a set of a/m t-bolts available I am keen to talk about those.
I don't mind if it has a little scratch in a visible area, but not dented please.
If you know you're going to part one out in six to 10 weeks, please give me a chance to negotiate something with you.
CONUS shipping will be requested.
Sponsored
Last edited: