I just got my engine back from MPR for my GT500 and It was shipped Aug 12 and Recieved it back Dec 18 it’s quite some time but I didn’t twanna rush nobody I just wanted it done right
I called around Black Friday and he told me if I had ordered then I should expect middle of January. 4-6 weeks. Not sure if that's changed today.
Thanks guys, I have a 19 on order tha I should have in the next 2 weeks or so. I also have a whipple stage 2 In my garage already. Basically If I have the rattle and tick. I may just get a mpr short block and be done with it. Not looking to break records 93 will be my limts as there is no e85 around really. But I'm not gonna deal with all the BS taking it in under warranty. So finger crossed.I would have had it much sooner but I ran into issues getting parts sent his way to finish the build. I would plan on 4-6 weeks as mentioned earlier. May vary due to part availability.
Sponsored