Melange_X3
Well-Known Member
- Joined
- Apr 10, 2019
- Threads
- 4
- Messages
- 575
- Reaction score
- 430
- Location
- Southern California
- First Name
- D
- Vehicle(s)
- 2016 Shelby GT350, 2017 Ford Focus ST, On Order 2020 CTFP Shelby GT 500 with POTTS. Car is released and awaiting shipment. I am running out of time before having to leave for Japan on July 29th.
- Thread starter
- #1
I origionally had a "Golden Ticket" GT 500 allocation ordered on July 2nd and late ther dealer I was working with took it from me and gave it to a VIP. They gave me my deposit back. I then ordered a Base GT500 and put down a relatively small deposit. Later through the forums here I found another "Golden Ticket" GT 500 and put down a big deposit on it. I was comfortable with having two GT 500s on order because I knew that if for some reason I got screwed out of the "Goldent Ticket" allocation that the dealership would have to give me my deposit back. The problem is that now the "Golden Ticket" GT500 won't be built until March and the Base GT500 jumped from Unscheduled Material Hold to now having a VIN and a build date in November. I am not worried about losing the small deposit on the base if I have to cancel it but if i cancel it and get screwed out of the 2nd "Golden Ticket" I won't have a GT500 at all. Any advice? The "Golden Ticket" car is sitting as unscheduled clean and the base GT 500 has a mid-november build date.
Sponsored