Sponsored

2020 GT500's Scheduled For Production - Part 1

Snoopy49

Well-Known Member
Joined
Jul 24, 2019
Threads
55
Messages
4,016
Reaction score
6,034
Location
California
First Name
Earl
Vehicle(s)
2013 GT500 - SOLD and 2020 GT500 - SOLD
This covers all the members GT500's that were produced in 2019.

If your car has been scheduled for production, please post date, last 4 numbers of VIN and State where the car was ordered.

I figured it would be a lot easier to track the scheduled GT500's if they were all in one thread.

Congratulations to you all. The 2019 list is officially closed today with the delivery of the last two 2019 cars, @kilobravo and @RapidResponder.

tenor.gif
3f1d9e8cf59302158a8a801844ea9323.gif


Updated 02/05/2020


0145
Ordered: 07/02
Original build week: 09/23
Build day: 10/09
Build week: 10/21
Build day: 12/02 (11/04/2019)
Build day: 12/03 (11/19/2019)
"Sent to Plant" (11/22/2019)
"Body Shop" (11/25/2019)
"Trim Line" (12/02/2019)
"Produced" (12/03/2019)
"Released" (12/09/2019) Awaiting Shipment
"Shipped Convoy" (12/12/2019)
"Delivered" (12/13/2019)
Bob Ruth Ford
Dillsburg PA
Base, Iconic Silver Metallic, Painted Black Roof, Black Racing Stripe - Vinyl and Technology Package


0153
Ordered: 07/06
Original Build week: 9/23
Build week: 10/7 on 9/9
Build day:10/11 on 9/17
Build day: 10/10 on 9/25
Build week: f 10/14 on 9/27
Build day: 11/1 on 10/3/2019
Build day: 10/22 on 10/09/2019
"Sent to Plant" (10/11/2019)
"Body Shop" (10/16/2019)
"Trim Line" (10/28/2019)
"Produced" (10/29/2019)
"Released" (12/19/2019) Awaiting Shipment
"Shipped Rail" (12/20/2019)
"Arrived Rail" (12/27/2019)
"Received In Transit" (12/27/2019)
"Delivered" (01/02/2020)
Arab, AL
Base, Ford Performance Blue Metallic, Bright White Racing Stripe, Handling Package and Technology Package


0171
Ordered: 07/12
Build day: 11/01
Build day: 10/24 (10/10/2019)
"Sent to Plant" (10/11/2019)
"Body Shop (10/18/2019)
"Trim Line" (10/22/2019)
"Produced" (10/22/2019)
"Released" (12/10/2019) Awaiting Shipment
"Shipped Convoy" (12/16/2019)
"Shipped Rail" (12/27/2019)
"Arrived Rail" (01/02/2020)
"Received" (01/02/2020) In Transit
"Delivered" (01/04/2020)
Daytona Beach, FL
Base, Ford Performance Blue Metallic, Bright White Racing Stripe, Handling Package and Technology Package


0195
Chassis # L0410
Ordered: 07/12
Build week: 23 Sep
Build day: 8 Oct
Build day: 27 Sep
Build day: 25 Oct
Build week: 12/02 (10/03/2019)
Build day: 12/04 (11/02/2019)
"Sent to Plant" (11/25/2019)
"Body Shop" (11/27/2019)
"Trim Line" (12/03/2019)
"Produced" (12/04/2019)
"Shipped Rail" (12/06/2019)
"Arrived Rail" (12/13/2019)
"Shipped Convoy" (01/09/2020)
"Delivered" (01/10/2020)
Garland, TX
Base, Twister Orange, Handling Package, Cover & Recaro Seats


0199
Chassis # L0414
Ordered: 07/08
Original Build Week: 10/07
Build Week: 12/02
Build day: 12/06
"Sent to Plant" (11/26/2019)
"Body Shop" (12/03/2019)
"Trim Line" (12/04/2019)
"Produced" (12/05/2019)
"Shipped Rail" (12/06/2019)
"Delivered" (01/10/2020)
Spring, TX
Base, Kona Blue, Handling Package, Technology Package, CF Instrument Panel, Blue car cover


0256
Ordered: 07/18
Build week of 09/23
Build day: 10/01
Build day: 10/08
Build week: 12/02 (10/04/2019)
Build day: 12/06 (11/13/2019)
"Sent to Plant" (11/22/2019)
"Body Shop" (11/26/2019)
"Trim Line" (12/03/2019)
"Produced" (12/04/2019)
"Released" (12/09/2019) Awaiting Shipment
"Received" (12/23/2019) Awaiting Shipment
"Shipped Convoy" (12/30/2019)
"Received" (12/30/2019) In Transit
"Shipped Rail" (01/03/2020)
"Delivered" (01/21/2020)
Edmonton, Alberta
Base, Magnetic Metallic with Black OTT Racing Stripe, Technology Package, and Handling Pack


0382
Ordered: 07/19
Build week: 11/4
"Sent to Plant" (10/11/2019)

"Body Shop" (10/13/2019)
"Trim Line" (10/18/2019)
"Produced" (10/18/2019)
"Released" (12/12/2019) Awaiting Shipment
"Shipped Rail" (12/13/2019)
"Shipped Convoy" (12/24/2019)
"Delivered" (12/24/2019)
Collins, MS
Base, Rapid Red Metallic, Recaro Seats, CF Instrument Panel, Black OTT Racing Stripe - Vinyl and side stripes, and Handling Pack


0395
Ordered: 07/02
Build week: 12/02 (10/20/2019)
Build day: 12/05 (11/19/2019)
"Sent to Plant" (11/25/2019)
"Body Shop" (11/27/2019)
"Trim Line" (12/03/2019)
"Produced" (12/04/2019)
"Released) (12/10/2019) Awaiting Shipment
"Shipped Rail" (12/14 /2019)
"Arrived Rail" (12/21/2019)
"Received" (12/21/2019) In Transit
"Shipped Convoy" (12/23/2019)
"Delivered" (12/23/2019)
Hampton, VA
Base, Velocity Blue, RECARO Leather-trimmed Seats and Cover with Cobra Logo - Blue


0444
Ordered: 07/17
Build week 10/21
"Body Shop" (10/21/2019)
"Trim Shop" (11/24/2019)
"Produced" (10/25/2019)
"Released" (12/16/2019) Awaiting Shipment
"Shipped Rail" (12/19/2019)
"Delivered" (01/11/2020)
Lou Fusz Ford
Chesterfield, MO
Base, Performance Blue, White Vinyl OTT and side Stripes, Technology Package


0499
Ordered: 07/03
"Sent to Plant" (10/07/2019)
"Body Shop" (10/15/2019)
"Trim Line" (10/22/2019)
"Produced" (10/22/2019)
"Released" (12/04/2019) Awaiting Shipment
"Shipped Rail" (12/07/2019)
"Received" (12/17/2019) In Transit
"Shipped Convoy" (01/09/2020)
"Delivered" (01/10/2020)
Hardwick, VT
Base, Rapid Red, OTT Stripe White, Tech Package, CF Instrument Panel


0522
Ordered: 07/19
Build week: 10/14/19
Build day: 10/16
Build week: 12/02 (10/10/2019)
"Sent to Plant" (11/26/2019)
"Body Shop" (12/03/2019)
"Trim Line" (12/06/2019)
"Produced" (12/09/2019)
"Received" (12/13/2019) Awaiting Shipment
"Shipped Convoy" (12/19/2019)
"Shipped Rail" (12/26/2019)
"Arrived Rail" (12/31/2019)
"Shipped Convoy" (01/07/2020)
"Delivered" (01/08/2020)
Lansdale, PA
Base, Iconic Silver, Technology Package, Handling Package, Black OTT Racing Stripe - Vinyl, Painted Black Roof and CF Instrument Panel


0527
Ordered: 07/05
Build week: 10/21
"Sent to Plant" (10/13/2019)
"Body Shop" (10/22/2019)
"Trim Line" (10/25/2019)
"Produced" (10/25/2019)
"Received" (11/08/2019) In Production
"Released" (12/02/2019) Awaiting Shipment
"Delivered" (01/16/2020)
Keller Bros Ford
Lebanon, PA
Base, Rapid Red Metallic, Black OTT and Side stripes, CF Instrument Panel, , Technology Package and Recaro seats


0536
Ordered: 08/13
Build week: 11/11/19 (10/04/2019)
"Sent to Plant" (11/25/2019)
"Body Shop" (11/26/2019)
"Trim Line" (12/04/2019)
"Produced" (12/05/2019)
"Received" (12/12/2019) Awaiting Shipment
"Shipped Convoy" (12/16/2019)
"Shipped Rail" (12/22/2019)
"Arrived Rail" (12/27/2019)
"Received" (12/28/2019) In Transit
"Delivered" (12/31/2019)
Hickory, NC
Base, Iconic Silver, Painted Black Roof, Black Race stripes vinyl, Recaro Seats, Technology Package, Handling Package and CF Instrument Panel


0545
Ordered: 07/02
"Sent to Plant" (1127/2019)
"Body Shop" (12/03/2019)
"Trim line" (12/06/2019)
"Produced" (12/09/2019)
"Shipped Rail" (12/12/2019)
"Arrived Rail" (12/18/2019)
"Delivered" (12/31/2019)
Calhoun, GA
Base, Velocity Blue, Technology Package and Full Vehicle Cover with Cobra Logo - Black


0569
Ordered: 07/11
Original build week: 10/07
Build date: 10/18
Build week: 11/11 (10/1/19)
Build week: 12/02 (10/08/2019)
"Sent To Plant" (12/06/2019)
"Body Shop" (12/10/2019)
"Trim Line" (12/13/2019)
"Produced" (12/13/2019)
"Released" (12/18/2019) Awaiting Shipment
"Shipped Rail" (12/19/2019)
"Received" (12/27/2019)
"Shipped Convoy" (01/05/2020)
"Delivered" (01/06/2020) Delivered to dealer
"Final Delivery" (01/18/2020) Delivered to owner
D'Iberville, MS
Base, Race Red, Black stripes top & side, Technology Package and Handling package


0587
Ordered: 08/09
Chassis # L0191
Original build week: 10/07
Build week: 11/11 (10/02/19)
"Sent to Plant " (10/19/2019)
"Body Shop" (10/24/2019)
"Trim Line" (10/28/2019)
"Produced" (10/29/2019)
"Released" (12/23/2019) Awaiting Shipment
"Shipped Convoy" (12/26/2019)
"Shipped Rail" (01/10/2020)
"Arrived Rail" (01/17/2020)
"Received" (01/22/2020) In Transit
"Delivered" (01/28/2020)
Veterans Ford
Tampa, FL
Base, Rapid Red Metallic, CF Instrument Panel, Handling Package, Technology Package and Black vinyl OTT stripes


0589
Ordered: 07/02
Build week: 10/07
Build week: 12/02
Build day: 12/10
"Produced" (12/12/2019)
"Released" (12/16/2019) Awaiting Shipment
"Shipped Rail" (12/17/2019)
"Arrived Rail" (12/26/2019)
"Received" (12/26/2019)
"Delivered" (12/30/2019)
Grieco Ford
Delray Beach, FL
Base, Iconic Silver, Ebony Racing Stripe, Cover with Logo - Gray and Technology Package


0618
Chassis # L0219
Ordered: 07/05
Original build week:10/14
Build day: 10/31
"Sent to Plant" (10/18/2019)
"Body Shop" (10/25/2019)
"Trim Line" (10/30/2019)
"Produced" (10/31/2019)
"Released" (12/16/2019) Awaiting Shipment
"Shipped Convoy" (12/19/2019)
"Shipped Rail" (12/21/2019)
"Arrived Rail" (12/24/2019)
"Delivered" (12/31/2019)
Frederick Ford
Frederick, MD
Base, Rapid Red Metallic, Handling Package, CF Instrument Panel and black vinyl OTT and side strips


0624
Ordered: 07/02
Build week: 10/30
Build week: 12/02 (10/09/2019)
Build week: 12/16 (11/04/2019)
"Sent to Plant" (12/04/2019)
"Body Shop" (12/04/2019)
"Trim Line" (12/11/2019)
"Produced" (12/12/2019)
"Released" (12/13/2019) Awaiting Shipment
"Shipped Convoy" (01/01/2020)
"Delivered" (01/02/2020)
Rocky Mount, VA
Base, Twister Orange, Recaro Seats and Handling Pack


0651
Ordered: 07/12
Build day: 10/09
"Sent to Plant" (12/11/2019)
"Body Shop" (12/13/2019)
"Trim Line" (12/18/2019)
"Produced" (12/19/2019)
"Received" (12/20/2019) Awaiting Shipment
"Shipped Convoy" (01/08/2020)
"Delivered" (01/09/2020)
Monroeville, PA
Base, Twister Orange, Painted Black Roof, Technology Package, Handling Package, Recaro Seats, and CF Instrument Panel


0654
Ordered: 07/06
Chassis # L0218
Original day 10/10
Build week: 11/11
Build week: 11/04 (10/10/2019)
Build day: 10/29 (10/18/2019)
"Sent to Plant " (10/19/2019)
"Body Shop " (10/24/2019)
"Trim Line" (10/30/2019)
"Produced: (10/31/2019)
"Shipped Rail" (12/12/2019)
"Delivered" (12/20/2019)
Williamsville, NY
Base, Rapid Red Metallic, Kona Blue Racing Stripe - Vinyl and Technology Package


0670
Ordered: 07/01
Original week: 10/21
Build day: 11/1
Build week: 11/11
Build week: 10/28 (10/04/2019)
Build day: 10/29 (10/08/2019)
Build day: 10/31 (10/17/2019)
Build week: 11/18 (10/28/2019)
"Sent to Plant" (11/01/2019)
"Body Shop" (11/06/2019)
"Trim Line" (11/08/2019)
"Produced" (11/12/2019)
"Received" (11/24/2019) Awaiting Shipment
"Delivered" (12/09/2019)
Warren, PA
Base, Rapid Red Metallic, Bright White Racing OTT Stripe, Recaro Seats, CF Instrument Panel, Handling Package and Technology Package


0690
Ordered: 07/02
Original build week: 10/07
Build day: 10/09
Build week: 11/11
Build day: 11/13
Build day: 10/30 (10/8/2019)
Build week: 11/18 (1/29/2019)
"Sent to Plant" (11/01/2019)
"Body Shop" (11/05/2019)
"Trim Line" (11/07/2019)
"Produced" (11/08/2019)
"Received" (11/11/2019) In Production
"Released" (11/29/2019) Awaiting Shipment
"Shipped Convoy" (12/06/2019)
"Delivered" (12/09/2019)
Bremen, IN
Base , Rapid Red Metallic ,Handling Package and Recaro Seats


0711
Chassis # L0171
Ordered: 07/09
Original build week: 10/21
Build week: 10/14
Build day: 10/25 (10/8/19)
Build day: 10/22 (10/10/2019)
"Sent to Plant" (10/11/2019)
"Body Shop" (10/22/2019)
"Trim Line" (10/25/2019)
"Produced" (10/28/2019)
"Released to Body Company" (12/10/2019)
"Received" (12/30/2019) Awaiting Shipment
"Shipped Rail" (01/24/2020)
"Received" (02/02/2020) In Transit
"Delivered" (02/03/2020
Corpus Christi, TX
Carbon Fiber Track Package, Rapid Red Metallic, Absolute Black Racing Stripe Painted and Technology Package


0723
Ordered: 07/17
Original build week: 10/07
Build day: 10/09
Build week: 10/14
Build week: 10/28
Build week: 11/11 (9/30/19)
Build week: 10/28 (10/8/2019)
Build week: 11/04 (10/10/2019)
Build week: 11/18 (10/29/2019)
"Sent to Plant" (11/01/2019)
"Body Shop" (11/05/2019)
"Trim Line" (11/08/2019)
"Produced" (11/08/2019)
"Released" (12/03/2019) Awaiting Shipment
"Shipped Rail" (12/05/2019)
"Arrived Rail" (12/11/2019)
"Received" (12/12/2019) In Transit
"Delivered" (01/09/2020)
Longview, TX
Base, Oxford White, Painted Black Roof, CF Instrument Panel, Technology Package and Recaro Seats


0726
Ordered: 07/02
Original build week: 10/07
Build day: 10/08
Build day: 10/15
Build day: 10/30
Build week: 11/11
Build week: 10/28 (10/08/2019)
Build day: 10/30 (10/14/2019)
Build day: 11/08 (10/21/2019)
Build week: 11/18 (10/30/2019)
"Sent to Plant" (11/01/2019)
"Body Shop" (11/07/2019)
"Trim Line" (11/12/2019)
"Produced" (11/13/2019)
"Released" (12/04/2019) Awaiting Shipment
"At Plant" (12/05/2019) In Production
"Re-Released" (12/09/209)
"Shipped Rail" (12/09/2019)
"Arrived Rail" (12/16/2019)
"Delivered" (12/17/2019)
Kaufman, TX
Base, Rapid Red Metallic, Black Racing OTT & Side Stripes, Recaro Seats, Technology Package, Handling Package and CF Instrument Panel


0729
Ordered: 07/09
"Produced" (11/08/2019)
"Released" (11/21/2019) Awaiting Shipment
"Received" (11/21/2019) Awaiting Shipment
"Shipped Rail" (11/22/2019)
"Received by Truck Company" (12/02/2019)
"Delivered" (12/04/2019)
Sherman, TX
Base, Oxford White, Kona Blue Racing Stripe - Vinyl, RECARO Leather-trimmed Seats, Full Vehicle Cover with Cobra Logo - Blue, Handling Pack and Technology Package


0734
Ordered: 07/02
Original build week: 10/21
Build week: 10/28
Build day: 10/31
Build week: 11/11
Build day: 11/15 (10/01/19)
Build week: 12/02 (10/09/2019)
Build Week: 12/09 (10/15/2019)
Build day: 12/09 (11/04/2019)
Build week: 12/16 (11/08/2019)
"Sent to Plant" (12/12/2019)
"Body Shop" (12/16/2019)
"Trim Line" (12/18/2019)
"Produced" (12/19/2019)
"Released" (12/20/2019) Awaiting Shipment
"Shipped Rail" (12/21/2019)
"Arrived Rail" (12/29/2019)
"Received" (12/30/2019) In Transit
"Shipped Convoy" (12/30/2019)
"Delivered" (12/31/2019)
Odessa, TX
Base, Twister Orange, Recaro Seats and Handling Pack


0737
Ordered: 07/15
Original build week 10/21
Build week: 10/28
Build day: 10/29
Build week: 11/11 (09/28/2019)
Build week: 10/28 (10/8/2019)
Build day 11/08 (10/16/2019)
Build week: 11/18 (10/31/2019)
"Sent to Plant" (11/01/2019)
"Body Shop" (11/05/2019)
"Trim Line" (11/07/2019)
"Produced" (11/08/2019)
"Released" (12/13/2019) Awaiting Shipment
"Shipped Rail" (12/17/2019)
"Arrived Rail" (01/02/2020)
"Received" (01/03/2020) In Transit
"Arrived Rail" (01/08/2020)
"Shipped Convoy" (01/09/2020)
"Delivered" (01/09/2020)
Chickasha, OK
Base, Ford Performance Blue, Bright White Racing OTT Stripes (vinyl), Side Stripes, Handling Package, Technology Package and Recaro Seats


0740
Ordered 07/09
"Sent to Plant" (11/04/2019)
"Body Shop" (11/06/2019)
"Trim Line" (11/08/2019)
"Produced" (11/12/2019)
"Released" (11/22/2019) Awaiting Shipment
"Shipped Rail" (11/23/2019)
"Received by Truck Co" (12/03/2019)
"Shipped Convoy (12/07/2019)
"Delivered" (12/08/2019)
Galveston, TX
Base, Oxford White, Recaro Seats, Handling Pack and Technology Package


0756
Chassis # L0250
Ordered: 07/01
Original build week: 10/14
Build week: 10/21
Build week: 10/28
Build week: 11/11 (10/03/19)
Build day: 11/06 (10/07/19)
Build day: 11/08 (10/18/19)
Build week: 11/18 (10/29/2019)
"Sent to Plant" (11/01/2019)
"Body Shop" (11/06/2019)
"Trim Shop" (11/12/2019)
"Produced" (11/13/2019)
"Released" (11/29/2019) Awaiting Shipment
"Shipped Rail" (12/05/2019)
"Arrived Rail" (12/09/2019)
"Shipped Convoy (01/10/2020)
"Delivered" (01/10/2020)
Chuck Anderson Ford
Excelsior Springs, MO
Base, Oxford White, Recaro Seats, Technology Package and Handling Pack


0759
Chassis # L0232
Ordered: 07/09
Original build week: 10/21
Build week: 10/28
Build week: 11/11 (10/04/2019)
Build week: 11/04 (10/09/2019)
Build week: 11/18 (10/30/2019)
"Sent to Plant" (11/01/2019)
"Body Shop" (11/05/2019)
"Trim Line" (11/07/2019)
"Produced" (11/08/2019)
"Released" (11/26/2019) Awaiting Shipment
"Shipped Rail" (12/05/2019)
"Arrived Rail" (12/09/2019)
"Shipped Convoy (01/10/2020)
"Delivered" (01/10/2020)
Chuck Anderson Ford
Tecumseh, NE
Base, Rapid Red Metallic, Bright White Racing OTT Stripe, Recaro Seats, Handling Package and Technology Package


0760
Ordered: 07/01
Original build week: 10/14
Build week: 12/02 (10/8/2019)
"Sent to Plant" (12/09/2019)
"Body Shop" (12/11/2019)
"Trim Line" (12/13/2019)
"Produced" (12/16/2019)
"Released" (12/28/2019) Awaiting Shipment
"Received" (12/30/2019) Awaiting Shipment
"Shipped Rail" (01/05/2020)
"Arrived Rail" (01/13/2020)
"Delivered" (01/15/2020)
Richmond, MO
Base, Oxford White, Kona Blue Stripes - Vinyl, Recaros, Carbon fiber IP, Tech package and Handling package


0761
Chassis # L0604
Ordered: 07/08
Original build week: 10/28
Build day: 11/01
Build week: 11/11 (10/04/2019)
Build week: 12/09 (10/16/2019)
Build day: 12/12 (11/04/2019)
Build day: 12/20 (11/11/2019)
Build day: 12/19 (11/18/2019)
Build day: 12/18 (11/25/2019)
Build day: 12/16 (12/03/2019)
Build day: 12/17 (12/09/2019)
"Sent to Plant" (12/10/2019)
"Body Shop" (12/13/2019)
"Trim Line" (12/17/2019)
"Produced" (12/18/2019)
"Released" (12/21/2019) Awaiting Shipment
"Received" (12/23/2019) Awaiting Shipment
"Shipped Convoy" (12/30/2019)
"Received" (12/30/2019) In Transit
"Shipped Rail" (01/07/2020)
"Arrived Rail" (01/12/2020)
"Delivered" (01/15/2020)
"Final Delivery" (01/31/2020)
Chuck Anderson Ford
Warsaw, MO
Base, Twister Orange, Black Racing OTT Stripe, Recaro Seats, Handling Package and Technology Package


0768
Ordered: 07/19
Build day: 10/30
"Sent to Plant" (11/04/2019)
"Body Shop" (11/08/2019)
"Trim Line" (11/13/2019)
"Produced" (11/14/2019)
"Released" (11/22/2019) Awaiting Shipment
"Shipped Rail" (12/05/2019)
"Delivered" (01/22/2020)
Junction City, KS
Base, Oxford White, Recaro Seats and Technology Package


0769
Ordered: 0‎7‎/0‎2
"Shipped Rail" (11/26/2019)
"Arrived Rail" (12/03/2019)
"Delivered" (12/13/2019)
Hays, KS
Base, Ford Performance Blue, Bright White Racing Stripe and Vehicle Cover with Cobra Logo - Blue‎‎


0775
Ordered: 07/29
Original build week: 10/14
Build day: 10/29
Build week: 11/11 (10/02/2019)
Build week: 12/09 (10/07/2019)
Build day: 12/12
Build week: 12/16 (11/07/2019)
Build day: 12/16 (11/08/2019)
Build day: 12/20 (11/18/2019)
Build day: 12/19 (11/25/2019)
"Sent to Plant" (12/12/2019)
"Body Shop" (12/17/2019)
"Trim Line" (12/19/2019)
"Produced" (12/20/2019)
"Shipped Rail" (12/21/2019)
"Arrived Rail" (01/02/2020)
"Shipped Convoy" (01/07/2020)
"Delivered" (01/07/2020)
Silver City, NM
Base, Twister Orange, Painted Black Roof and Technology Package


0785
Ordered: 07/11
Original week: 10/21
Build day: 11/01
Build week: 11/11 (10/04/2019)
Build week: 12/09 (10/10/2019)
"Sent to Plant" (12/11/2019)
"Body Shop" (12/16/2019)
"Trim Line" (12/18/2019)
"Produced" (12/19/2019)
"Released" (12/28/2019) Awaiting Shipment
"Received" (12/30/2019) Awaiting Shipment
"Shipped Convoy" (12/30/2019)
"Received" (01/03/2020) In Transit
"Shipped Rail" (01/16/2020)
"Arrived Rail" (01/22/2020)
"Delivered" (01/23/2020)
Sauk Centre, MN
Base, Twister Orange, Painted Black Roof, CF Instrument Panel, Technology Package and Handling Pack


0789
Ordered: 08/09
Build week: 10/21
Build day: 11/05 (10/10/2019)
"Sent to Plant" (11/04/2019)
"Body Shop" (11/07/2019)
"Trim Line" (11/08/2019)
"Produced" (11/08/2019)
"Received" (11/29/2019) Awaiting Shipment
"Shipped Rail" (12/07/2019)
"Arrived Rail" (12/13/2019)
"Delivered" (01/13/2020)
Mitchell, SD
Base, Rapid Red Metallic, Black Racing OTT Stripe, Recaro Seats, Technology Package and Handling Pack


0846
Chassis # L0125
Ordered: 07/31
Original build week: 10/14
Build week: 11/04
"Sent to Plant" (10/7/2019)
"Body Shop" (10/13/2019)
"Trim Line" (10/18/2019)
"Chassis Line" (10/21/2019)
"Final Inspection" (10/21/2019)
"Produced" (10/21/2019)
"Released to Body Company" (12/09/2019)
"Returned from Body Company" (01/16/2020)
"Released" (01/21/2020) Awaiting Shipment
"Shipped Rail" (01/23/2020)
"Arrived Rail" (02/042020)
"Delivered" (02/05/2020)
Seattle, WA
Carbon Fiber Track Package, Rapid Red Metallic, Painted Oxford White OTT Racing Stripe and Technology Package


0909
Chassis # 0611
Ordered: 08/16
Original build week: 10/21
Build week: 11/11
Build week: 12/09 (10/17/2019)
Build day: 12/16 (11/16/2019)
Build day: 12/17 (12/09/2019)
"Sent to Plant" (12/10/2019)
"Body Shop" (12/13/2019)
"Trim Line" (12/17/2019)
"Produced" (12/18/2019)
"Received" (12/19/2019) Awaiting Shipment
"Delivered" (12/27/2019)
Dearborn, MI
Base, Kona Blue, Bright White Racing Stripe, Cover with Cobra Logo - Blue, Handling Pack and Technology Package


0930
Ordered: 08/07
Original week of 10/28
Build week: 11/4
Build week: 11/11
Build week: 12/09
Build day: 12/12
Build day: 12/22
"Sent to Plant" (12/11/2019)
"Body Shop" (12/13/2019)
"Trim Line" (12/17/2019)
"Produced" (12/18/2019)
"Received" (12/23/2019) Awaiting Shipment
"Shipped Convoy" (12/30/2019)
"Received" (12/30/2019) In Transit
"Shipped Rail" (01/05/2020)
"Arrived Rail" (01/13/2020)
"Delivered" (01/15/2020)
Granger Ford
Granger, IA
Base, Iconic Silver, Black OTT Racing Stripe - Vinyl, Handling Package and Technology Package


0954
Chassis # L0261
Ordered: 08/05
Original build week: 10/28
Build week: 11/04
Build week 11/11
Build day: 11/15 (10/05/19)
Build day: 11//14 (10/21/2019)
Build day: 11/13 (10/28/2019)
Build week: 11/18 (11/01/2019)
"Sent to Plant" (11/04/2019)
"Body Shop" (11/08/2019)
"Trim Line (11/12/2019)
"Produced" (11/08/2019)
"Released" (11/19/2019) - Second Customer car to be Released and the first on the list :like:
"Received" (11/19/2019) - Awaiting Shipment
"Shipped Rail" (11/30/2019)
"Shipped Convoy" (12/09/2019)
"Delivered" (12/09/2019)
Auburn, MA
Base, Ford Performance Blue, Recaro seats, Vinyl OTT & Side Stripes (White), Handling Package, Technology Package, CF Instrument Panel and Blue Vehicle Cover


0999
Ordered: 07/17
Build week: 12/09 (10/23/2019)
"Sent to Plant" (12/09/2019)
"Body Shop" (12/12/2019)
"Trim Line" (12/16/2019)
"Produced" (12/17/2019)
"Received" (12/19/2019) In Production
"Received" (12/19/2019) Awaiting Shipment
"Shipped Convoy" (12/26/2019)
"Shipped Rail" (12/26/2019)
"Arrived Rail" (12/31/2019)
"Shipped Convoy" (01/08/2020)
"Delivered" (01/10/2020)
Plainville, CT
Base, Iconic Silver, Ebony Racing Stripe - Vinyl, RECARO Leather-trimmed Seats, Cover with Cobra Logo - Black, Technology Package and Handling Pack


1034
Ordered: 07/02
Original build week: 11/04
Build week: 11/11 (9/30/19)
Build day: 11/15 (10/16/2019)
"Sent to Plant" (11/08/2109)
"Body Shop" (11/18/2019)
"Trim Line" (11/21/2019)
"Produced" (11/21/2019)
"Received" (12/05/2019) Awaiting Shipment
"Delivered" (01/21/2020)
Lewisburg, TN
Base, Ford Performance Blue, Black OTT Racing Stripe - Vinyl, Recaro Seats, Handling Package and Technology Package


1074
Ordered: 07/15
Build week: 11/11
Build day: 11/14 (10/21/2019)
"Sent to Plant" (11/08/2019)
"Body Shop" (11/12/2019)
"Trim Line" (11/18/2019)
"Produced" (11/18/2019)
"Released" (11/26/2019) Awaiting Shipment
"Received" (11/27/2019) Awaiting Shipment
"Shipped Convoy" (11/29/2019)
"Delivered" (12/03/2019) First on the List
Ebensburg, PA
Base, Rapid Red Metallic, Bright White Racing Stripe, Cover with Cobra Logo - Red and Technology Package


1075
Ordered: 08/02
Build week: 12/09 (10/23/2019)
"Sent to Plant" (12/11/2019)
"Body Shop" (12/13/2019)
"Trim Line" (12/17/2019)
"Produced" (12/18/2019)
"Received" (12/20/2019) Awaiting Shipment
"Shipped Convoy" (12/23/2019)
"Delivered" (12/24/2019)
Salem, OH
Base, Iconic Silver, RECARO Leather-trimmed Seats, Cover with Cobra Logo - Black, Carbon Fiber Instrument Panel and Technology Package


1125
Ordered: 08/06
Build week: 11/04
Build week: 11/11 (10/03/2019)
Build week: 11/17 (10/10/2019)
Build week: 11/18 (10/22/2019)
Build day: 11/14 (10/28/2019)
"Sent to Plant" (11/08/2019)
"Body Shop" (11/13/2019)
"Trim Line" (11/18/2019)
"Produced" (11/18/2019)
"Released" (12/04/2019) Awaiting Shipment
"Shipped Rail" (12/07/2019)
"Arrived Rail" (12/13/2019)
"Delivered" (01/09/2020)
Mount Vernon, IL
Base, Rapid Red Metallic, Ebony Racing Stripe - Vinyl, Handling Pack and Technology Package


1133
Ordered: 07/27
Original build week: 11/11
Build week: 12/09 (10/8/2019)
Build week: 01/27/20 (11/08/2019)
"Sent to Plant" (12/06/2019)
"Body Shop (12/10/2019)
"Trim Line" (12/13/2019)
"Produced" (12/13/2019)
"Released" (12/24/2019) Awaiting Shipment
"Received" (12/28/2019) Awaiting Shipment
"Shipped Convoy" (12/30/2019)
"Received" (12/30/2019) In Transit
"Shipped Rail" (01/08/2020)
"Arrived Rail" (01/12/2020)
"Delivered" (01/20/2020)
Saint James, MO
Base, Iconic Silver, Black OTT Racing Stripe - Vinyl, Painted Black Roof, Technology Package and CF Instrument Panel


1213
Ordered: 09/10
"Produced" (10/17/2019)
"Shipped Rail" (12/28/2019)
"Arrived Rail" (12/31/2019)
"Received" (12/04/2020) In Transit
"Delivered" (12/31/2019)
Kenosha, WI
Base, Ford Performance Blue, Cover with Cobra Logo - Blue, and Technology Package


1277
Chassis # L0199
Ordered: 08/13
"Produced" (10/29/2019)
"Released" (12/02/2019) Awaiting Shipment
"Shipped Rail" (12/03/2019)
"Arrived Rail" (12/11/2019)
"Delivered" (01/11/2020)
North Hills, CA
Carbon Track Pack, Ford Performance Blue, Painted Black Roof, Full Vehicle Cover with Cobra Logo - Black and Technology Package
Sponsored

 
Last edited:

Nolimits88

Well-Known Member
Joined
Jun 29, 2019
Threads
2
Messages
268
Reaction score
218
Location
Upstate NY
First Name
Justin
Vehicle(s)
2014 GT500 2020 TO GT500 2021 GT500 CARBON PKG
You know me from over at SVTP

Last 4 of VIN#-0761 Build date-10/21/19

Ordered through Nick (Chuck Anderson Ford)

Twister Orange/Black Vinyl/Tech Pck/Handling Pck/Carbon Interior/Recaro's
 

Sponsored

chill66

Well-Known Member
Joined
May 15, 2014
Threads
3
Messages
704
Reaction score
577
Location
Reno, NV
First Name
Chris
Vehicle(s)
2020 Twister Orange GT500
10/14
0775
New Mexico
Base/Twister Orange/Painted Black Roof/Tech Pack
 
Last edited:

Nolimits88

Well-Known Member
Joined
Jun 29, 2019
Threads
2
Messages
268
Reaction score
218
Location
Upstate NY
First Name
Justin
Vehicle(s)
2014 GT500 2020 TO GT500 2021 GT500 CARBON PKG

chill66

Well-Known Member
Joined
May 15, 2014
Threads
3
Messages
704
Reaction score
577
Location
Reno, NV
First Name
Chris
Vehicle(s)
2020 Twister Orange GT500
Weird, I have a lower VIN and you are a week before me.
That is weird. I would assume these come off the line in order, but maybe not?
 

Sponsored

PP0001

Well-Known Member
Joined
Jun 9, 2015
Threads
53
Messages
4,810
Reaction score
5,619
Location
Both Sides of the Border
Vehicle(s)
2021 CTR LE (126 & 581)
That is weird. I would assume these come off the line in order, but maybe not?
Assigned VIN numbers have absolutely nothing to do with scheduled production dates or assigned chassis number and it has been that way for a very long time at Ford.

A great example of that was when Ford produced 12 Pilot Production Boss 302's for the 2012 MY and I was very fortunate to locate and purchase "PP0001" and "PP0002" which were the chassis numbers for each of these vehicles.

Chassis number PP0001 was a two seat 2012 Laguna Seca model and was built on Monday, October 25th, 2010 with chassis number PP0002 being a PW 4 seat Boss 302 and was built on Tuesday, October 26th, 2010.

Even though PP0001 had and earlier production date the VIN number was a higher number than chassis number PP0002.

There were 12 PP Boss 302's built on those two days back in 2010 with PP0001 having a VIN ending in "015" and PP0002 having a VIN ending in "013".

Also the very last of these PP cars had the lowest VIN number for all of the 12 cars produced.

Another good example is "HR001" which is the first 2017 GT350R which was built for Jamal Hameedi and his VIN ended in "003" therefore there were 2 other Mustangs produced ahead of his.

The only examples of limited production Mustangs that I am aware of in recent years whereby the VIN and chassis number match each other and come off of the FRAP in consecutive order was the 2015 GT350/R's.

Each of the 137 cars produced for the 2015MY (37 R's, 50 Track Pack's and 50 Tech Pack's) had a VIN and chassis number that matched each other therefore they all came off of the FRAP assembly line in consecutive order with the VIN and chassis numbers matching each other from a consecutive production order standpoint.

Bottom line is whoever has the earliest scheduled production date they will have the earliest chassis number on the dash of their GT500.

I hope that all of the above makes some sense to you!

:)
 

chill66

Well-Known Member
Joined
May 15, 2014
Threads
3
Messages
704
Reaction score
577
Location
Reno, NV
First Name
Chris
Vehicle(s)
2020 Twister Orange GT500
Assigned VIN numbers have absolutely nothing to do with scheduled production dates or assigned chassis number and it has been that way for a very long time at Ford.

A great example of that was when Ford produced 12 Pilot Production Boss 302's for the 2012 MY and I was very fortunate to locate and purchase "PP0001" and "PP0002" which were the chassis numbers for each of these vehicles.

Chassis number PP0001 was a two seat 2012 Laguna Seca model and was built on Monday, October 25th, 2010 with chassis number PP0002 being a PW 4 seat Boss 302 and was built on Tuesday, October 26th, 2010.

Even though PP0001 had and earlier production date the VIN number was a higher number than chassis number PP0002.

There were 12 PP Boss 302's built on those two days back in 2010 with PP0001 having a VIN ending in "015" and PP0002 having a VIN ending in "013".

Also the very last of these PP cars had the lowest VIN number for all of the 12 cars produced.

Another good example is "HR001" which is the first 2017 GT350R which was built for Jamal Hameedi and his VIN ended in "003" therefore there were 2 other Mustangs produced ahead of his.

The only examples of limited production Mustangs that I am aware of in recent years whereby the VIN and chassis number match each other and come off of the FRAP in consecutive order was the 2015 GT350/R's.

Each of the 137 cars produced for the 2015MY (37 R's, 50 Track Pack's and 50 Tech Pack's) had a VIN and chassis number that matched each other therefore they all came off of the FRAP assembly line in consecutive order with the VIN and chassis numbers matching each other from a consecutive production order standpoint.

Bottom line is whoever has the earliest scheduled production date they will have the earliest chassis number on the dash of their GT500.

I hope that all of the above makes some sense to you!

:)
Very informative and definitely makes _some_ sense. ;) Thanks for that PP0001!
 

AMBJR

Well-Known Member
Joined
Jul 9, 2019
Threads
4
Messages
316
Reaction score
162
Location
92124
First Name
ALLEN
Vehicle(s)
03 Mustang Cobra-20 GT500
FOR FUTURE USE!!!
00195 & 00256 Doesn't show on the "FORD VEHICLE ORDER TRACKING" Website yet!!!
 
Last edited:
 




Top